Search here...

Case Studies

Integration between S/4 HANA Private Cloud and IBM Maximo in Azomures 

Project Objectives:
Develop Interfaces and design new process flows in IBM Maximo

Scope of work
  • Analysis of the maintenance activities and process flows;
  • Function and technical specifications of interfaces;
  • Design Interfaces communication and flow;
  • Interface implementation and testing;
  • Maximo configuration according new process;
  • Training;

Client

Azomures

Project

Integration between S/4 HANA Private Cloud and IBM Maximo

Location

Mures, Romania

Type of Work

Software Implementation

Period

2021-2022

Maximo Asset Management Oil and Gas POC - Implementation in Chimcomplex Valcea 

Project Objectives:

Pilot Project for Implementation of Maximo Enterprise Asset Management Oil and Gas at Chimcomplex

Scope of work
  • Define business process model in accordance with chemical process requirements;
  • Audit of maintenance activity;
  • Technical and functional solution design
  • Implemented in one production department: Asset Management, Work Orders, Planning (Job Plan), Preventive Maintenance (PM), Inventory (Items Master, Inventory), Calibration; Digital Approval Flows, Reports;
  •  

Client

Chimcomplex

Project

POC-Implementation Maximo Oil&Gas

Location

Valcea, Romania

Type of Work

Software Implementation

Period

2021

Maximo Asset Management POC - Implementation in Zentiva 

Project Objectives:
Pilot Project for Implementation of Maximo Enterprise Asset Management – Calibration add-On at Zentiva

Scope of work
  • Define business process model in accordance with FDA regulation;
  • Defining the requirements for asset Calibration add-on;
  • Technical and functional solution design

Client

Zentiva

Project

POC-Implementation Maximo

Location

Bucuresti, Romania

Type of Work

Software Implementation

Period

2021

Maximo Asset Management implementation in Pewete  

Project Objectives:

Implementation of Maximo Enterprise Asset Management in Pewete

Scope of work
  • Define business process model;
  • Technical and functional solution design
  • Implemented: Asset Management, Work Orders, Planning (Job Plan), Preventive Maintenance (PM), Inventory (Items Master, Inventory), Reports;
  • Technical documentation;
  • User training;

Client

PeWeTe

Project

Implementation Maximo

Location

Bucuresti, Romania

Type of Work

Software Implementation

Period

2019

Maximo Asset Management stock interface with SAP 

Project Objectives:

New interface material movement from SAP-to Maximo

Scope of work
  • New interface SAP-Maximo for total material quantity;
  • New table buffer and new trigger;
  • Stock synchronization after integration;
  • Technical and functional solution documentation
  • User training;

Client

Rompetrol

Project

Equipment evidence in Maximo

Location

Constanta, Romania

Type of Work

Software Implementation

Period

2019

Technical Support for Maximo Asset Management

Project Objectives:

Technical support for IBM Maximo software 2018, 2019, 2020, 2021

Scope of work
  • SLA for Maximo infrastructure;
  • Bug monitoring;
  • New products presentation;

Client

Rompetrol

Project

Technical support for IBM Maximo software     

Location

Constanta, Romania

Type of Work

Software Support

Period

2018-2021

Maximo Asset Management implementation in Rompetrol 

Project Objectives:

Automation of evidence for pressure vessels, boilers, pressure pipes and lifting equipment and related licenses in Maximo

Scope of work
  • Compliance with ISCIR requirements;
  • Compliance with all quality, health, safety and environmental requirements (QHSE) in accordance with applicable legal regulations and the Beneficiary’s requirements;
  • Technical and functional solution design
  • KPIs, Reports;
  • User training;

Client

Rompetrol

Project

Equipment evidence in Maximo

Location

Constanta, Romania

Type of Work

Software Support

Period

2019

IBM Maximo implementation in Azomures

Project Objectives:

Computerized Maintenance Management System implementation in Azomures

Scope of work
  • Technical and functional solution design;
  • Implemented: Work Management, Asset Management, KPIs, Reports;
  • Materials Management interface with SAP;
  • Interface with Oracle Primavera;
  • Interface with SKF Decision Support;
  • User training.

Client

Azomures

Project

Implement Maximo

Location

Tg. Mures, Romania

Type of Work

Software Implementation

Period

2015

IBM Maximo implementation in NIS

Project Objectives:

Computerized Maintenance Management System implementation in Azomures

Scope of work
  • Overall Project Management & Procurement;
  • Full CMMS implementation Turnkey project in the NIS refinery in Pancevo, Serbia;
  • Construction and improvement of assets, locations and preventive maintenance system hierarchically;
  • Definition and construction of rotating equipment;
  • Developing an operational and management reports;
  • Developing of queries, Key performance indicators (KPI);
  • Integration with SAP system, calibration laboratories;
  • Construction and integration with document management system / Drawings.

Client

NIS

Project

Implement Maximo

Location

Serbia

Type of Work

Software Implementation

Period

2014

Maximo Asset Management implementation in Rompetrol 

Project Objectives:

Computerized Maintenance Management System implementation in Rompetrol

Scope of work
  • Technical and functional solution design
  • Implemented: Work Management, Procurement, Asset Management, Materials Management, Contract Management, KPIs, Reports;
  • Interfaces with Oracle ERP and OsiSoftPI
  • User training;

Client

Rompetrol

Project

Implement Maximo

Location

Constanta, Romania

Type of Work

Software Implementation

Period

2015